Rain belongs in the construction plan. The schedule should acknowledge it before the first storm arrives.

Rain in Florida is not an unusual event that can be ignored until it appears in the forecast. It is a predictable construction condition that should be considered during planning.
The goal is not to pretend weather will never affect the work. The goal is to reduce avoidable damage, protect completed construction, and give the schedule room to recover.
Control water at the site
Temporary drainage should be established early. Water needs a planned route away from excavations, stored materials, entrances, and active work areas.
Pumps, temporary swales, protected openings, and stabilized access routes may all be necessary depending on the project. These measures should be inspected regularly because site conditions change as construction advances.
Protect materials before the storm
Materials should be stored according to manufacturer requirements, elevated where necessary, and covered without trapping moisture.
Interior products, insulation, drywall, flooring materials, equipment, and packaged finishes require particular care. Deliveries should also be coordinated with the forecast and the building’s level of enclosure.
Sequence weather-sensitive work carefully
Concrete placement, coatings, waterproofing, roofing, exterior finishes, and site work each have temperature and moisture limitations. The schedule should recognize those limitations rather than forcing work into unsuitable conditions.
Interior and off-site activities can sometimes be advanced while exterior work is delayed. Shop fabrication, coordination, layout, inspections, and preparation can keep the project moving when properly planned.
Document and recover
After significant rain, conditions should be inspected before work resumes. Wet substrates, standing water, erosion, damaged protection, and moisture inside assemblies must be addressed instead of concealed.
Weather may affect a construction schedule. Preparation determines whether that effect is temporary or becomes a lasting problem.